- Portable External USB SATA Enclosure 2 SSD to USB 3.1 This Enclosure is only compatible with NVME & M.2 SATA protocol SSD. M Key (5 Pin) and B+M key SSDs only of sizes 2230/2242/2260/2280 | Please check the Compatibility of your SSD before purchasing.
- Super Fast Data Transfer 10GGbps SSD Enclosure External USB3.1 GEN2 USB Type-C output interface, support UASP acceleration protocol, and have stable and high-speed data transmission; the SSD equipped with NGFF (SATA) protocol has a theoretical speed 10Gbps, up to 2TB SSD can be installed. 20X Faster than USB 2.0; transfer large files in just seconds!
- Widely Compatible SSD Case SATA Enclosure compatible with Windows, Linux and Android. Support UASP / Trim with ultra-fast transmission speed. Supports Plug & Play and Hot-Swapping. You can snap in your SATA drive and keep it in this enclosure and use it as a portable hard drive.
- Tool-Free Design This is the newest version of M.2 NGFF & SATA SSD Enclosure, which is much easier to be installed with no other tools needed. Just press ‘Open’ pull it gently to open the enclosure and insert your SSD into it with no effort. The package comes with 2 fasteners to help fix your SSD.
| Item Weight | 80 Grams |
| Memory Storage Capacity | 10 GB |
| Compatible Devices | SSD |
| Hard Disk Form Factor | 2 Inch |
| Max Number of Supported Devices | 1 |
| Data Transfer Rate | 10 Gigabits Per Second |
| Manufacturer | EVM |
| Series | Type-C Output SSD External |
| Form Factor | M.2 |
| Item Height | 17 Centimeters |
| Item Width | 20 Millimeters |
| Product Dimensions | 7 x 2 x 17 cm; 80 g |
| Item Model Number | EVM-CG-001 |
| Hard Drive Size | 2 TB |
| Hard Disk Description | Solid State Drive |
| Are Batteries Included | No |
| Included Components | 1 M.2 SSD Case, 2 Cables and User manual |
| Manufacturer | EVM |
| Warranty | 5 Years |
| Note** | **Prices, Specifications & Features are subject to change without notice |






Reviews
There are no reviews yet.